Skip to main content
Skip to main content
SSR Logo
  • Homessr-mining-logo
    • Company
    • Operations
    • Investors
      • News
      • Presentations and Events
      • Reports & Filings
      • Analyst Coverage
      • Annual Meeting
      • Investor Kit/Download Library
      • Stock Info
      • Dividends
      • Email Alerts
    • Corporate
      Responsibility
    • Careers
    • Connect
    • Email
      Signup

Press Release Details

View All News

Silver Standard Announces First Drill Results from Snowfield Project

September 25, 2006
  • Download (opens in new window)

VANCOUVER, BRITISH COLUMBIA, Sep 25, 2006 (MARKET WIRE via COMTEX News Network) -- Silver Standard Resources Inc. (TSX: SSO)(NASDAQ: SSRI) is pleased to announce the results of the first ten drill holes from the Snowfield Project located 40 kilometers north of the town of Stewart and 15 kilometers southeast of Barrick's high-grade gold-silver mine at Eskay Creek in northern British Columbia. Snowfield is a non-core Silver Standard project consisting of a gold-molybdenum mineralized zone adjacent to the company's silver-gold Sulphurets Project. Silver Standard believes that the Snowfield Project holds considerable locked-in value, and has designed a drill program to define a mineral resource.

The following table sets out the assay results for the first ten drill holes, with six of the holes ending in mineralization:

-----------------------------------------------------------------------
Drilling Results from Snowfield Project --- September 2006
-----------------------------------------------------------------------
                                    Inter-
                                      val                Inter-
                         From    To    (1)  Gold  Molyb-   val     Gold
Hole     Collar     Dip/ (met- (met- (met- Grade  denum     (1)   Grade
No.    Location Azimuth   ers)  ers)  ers)  (g/t)    (%) (feet) (oz/ton)
-----------------------------------------------------------------------
SF-01   E424857/     90   3.1 152.4 149.4   1.61  0.019    490    0.046
(2)    N6264050 degrees/
                    000
                degrees
-----------------------------------------------------------------------
SF-02   E424858/    -50   3.6 199.0 195.4   1.51  0.018    641    0.044
(2)    N6264050 degrees/
                     90
                degrees
-----------------------------------------------------------------------
SF-03   E424901/     90   1.2 157.9 156.7   1.93  0.019    514    0.056
(2)    N6264049 degrees/
                    000
                degrees
-----------------------------------------------------------------------
                   incl.  1.2  72.5  71.3   2.76  0.019    234    0.081
SF-04   E424953/    -50   0.6 206.7 206.1   1.94  0.015    676    0.057
       N6264055 degrees/
                     90
                degrees
-----------------------------------------------------------------------
                   incl. 10.1 104.5  94.5   3.06  0.016    310    0.089
SF-05   E424952/     90   0.6 150.0 149.4   1.55  0.019    490    0.045
(2)    N6264055 degrees/
                    000
                degrees
-----------------------------------------------------------------------
SF-06   E425002/     90   1.8 153.0 151.2   2.18  0.017    496    0.064
(2)    N6264050 degrees/
                    000
                degrees
-----------------------------------------------------------------------
                   incl.  1.8  38.7  36.9   3.14  0.019    121    0.092
-----------------------------------------------------------------------
SF-07   E424950/     90   3.7 109.1 105.5   0.81  0.012    346    0.024
       N6264100 degrees/
                    000
                degrees
-----------------------------------------------------------------------
SF-08   E425000/     90   2.2 152.7 150.5   1.28  0.018    494    0.037
(2)    N6264100 degrees/
                    000
                degrees
-----------------------------------------------------------------------
SF-09   E425050/     90   1.4 143.9 142.5   1.43  0.014    467    0.042
       N6264100 degrees/
                    000
                degrees
-----------------------------------------------------------------------
                   incl.  5.2  28.0  22.9   2.32  0.015     75    0.068
-----------------------------------------------------------------------
SF-10   E425050/    -50   4.6 201.5 196.9   1.54  0.011    646    0.045
       N6264050 degrees/
                     90
                degrees
-----------------------------------------------------------------------
                   incl.  4.6  55.2  50.6   3.23  0.014    166    0.094
-----------------------------------------------------------------------
1. True thickness to be determined. Kenneth C. McNaughton, M.A.Sc.,
   P.Eng., and Vice President, exploration, Silver Standard Resources
   Inc., is the Qualified Person (QP) responsible for the Snowfields
   exploration program and has verified the data in the table above.
   All samples were submitted for preparation and analysis by ALS
   Chemex at its facilities in Vancouver, B.C. All samples were
   analyzed using aqua regia digestion with ICP finish. Samples over
   100 ppm silver were reanalyzed using four acid digestion with an ore
   grade AA finish. Samples over 1,000 ppm silver were fire assayed
   with a gravimetric finish. Samples with over 10 ppm gold were fire
   assayed with a gravimetric finish. One in 20 samples were blind
   duplicate assayed at ALS Chemex in Vancouver, B.C.
2. Hole ended in mineralization

The gold-molybdenum mineralization at Snowfield occurs in a zone of pyritic quartz-sericite-chlorite schists that likely represent Jurrassic-age intermediate volcanic rocks. Drilling to date on 100-meter centers with infill holes on 50-meter centers has outlined a rectangular area approximately 400 meters by 300 meters, which is mineralized to depths in excess of 200 meters. The consistency of the gold-molybdenum mineralization encountered to date both along strike and down-hole within the targeted zone is particularly encouraging to the company. The gold-copper mineralization that Seabridge Gold Inc. is currently testing at the Mitchell Zone on its Kerr-Sulphurets project is located approximately two kilometers northwest of the Snowfield Project.

Drilling is continuing at Snowfield with over 5,000 meters completed out of a planned program exceeding 6,000 meters. Upon receipt of the remaining drill hole assays, the company will prepare a resource estimate which it expects to finalize before the end of the fourth quarter of this year. Silver Standard plans to carry out additional drilling at Snowfield next year.

Kenneth C. McNaughton, M.A.Sc., P.Eng., Vice President, exploration, Silver Standard Resources Inc., is the qualified person responsible for the exploration program at Snowfield.

Silver Standard Resources Inc. is a well-financed silver resource company that continues to seek growth through silver acquisitions, and exploration and development of its own silver projects (SSRI-SN).

To receive Silver Standard's news releases by e-mail, contact Paul LaFontaine, director, investor relations at invest@silverstandard.com or call (888) 338-0046. The statements that are not historical facts are forward-looking statements involving known and unknown risks and uncertainties which could cause actual results to vary considerably from these statements. The risks and uncertainties include those described in Silver Standard's SEC Form 20F as amended.

Statements contained in this news release that are not historical fact, such as statements regarding the economic prospects of the company's projects, future plans or future revenues, timing of development or potential expansion or improvements, are forward-looking statements as that term is defined in the Private Securities Litigation Reform Act of 1995. Such forward-looking statements are subject to risks and uncertainties which could cause actual results to differ materially from estimated results. Such risks and uncertainties include, but are not limited to, the company's ability to raise sufficient capital to fund development, changes in economic conditions or financial markets, changes in prices for the company's mineral products or increases in input costs, litigation, legislative, environmental and other judicial, regulatory, political and competitive developments in Canada, technological and operational difficulties or inability to obtain permits encountered in connection with exploration and development activities, labour relations matters, and changing foreign exchange rates, all of which are described more fully in the company's filings with the Securities and Exchange Commission.

The TSX has neither approved nor disapproved of the information contained herein.

Contacts:
Silver Standard Resources Inc.
Robert A. Quartermain
President
(604) 689-3846
Silver Standard Resources Inc.
Paul LaFontaine
Director, Investor Relations
N.A. Toll Free: 1-888-338-0046 or Direct: (604) 484-8212
invest@silverstandard.com www.silverstandard.com

SOURCE: Silver Standard Resources Inc.

mailto:invest@silverstandard.com
http://www.silverstandard.com

Copyright 2006 Market Wire, All rights reserved.

News Provided by COMTEX

View All News

Email Alerts

*
*

 
Enter the code shown above.
*

SSR Mining Inc logo
Copyright © SSR Mining.
All Rights Reserved.
Terms and Conditions Privacy Policy
Powered By Q4 Inc. 5.193.2.1 (opens in new window)