Skip to main content
Skip to main content
SSR Logo
  • Homessr-mining-logo
    • Company
    • Operations
    • Investors
      • News
      • Presentations and Events
      • Reports & Filings
      • Analyst Coverage
      • Annual Meeting
      • Investor Kit/Download Library
      • Stock Info
      • Dividends
      • Email Alerts
    • Corporate
      Responsibility
    • Careers
    • Connect
    • Email
      Signup

Press Release Details

View All News

Silver Standard Files 43-101 Report for Pirquitas Silver Project

April 28, 2006
  • Download (opens in new window)
VANCOUVER, BRITISH COLUMBIA - Silver Standard Resources Inc. (TSX:SSO)(NASDAQ:SSRI) is pleased to report that it has filed with the securities regulatory authorities in each of the provinces of British Columbia, Alberta, Ontario and Quebec the technical report on the Pirquitas silver, tin and zinc project prepared in accordance with National Instrument 43-101 by Hatch Ltd. and Mine Development Associates, Inc., independent engineering firms. The technical report can be accessed on-line at www.sedar.com. The property is located in the province of Jujuy in northern Argentina.

Based on the results of the technical report, the reserves and resources for the Pirquitas project are set out in the following tables.

Pirquitas 43-101 Report 
Proven & Probable Reserves (i)
--------------------------------------------------------------------
                                                           Contained
                                                              Silver
                         Ore     Silver    Tin   Zinc            (oz.
Class                    (kt)  (g/tonne)    (%)    (%)   in millions)
--------------------------------------------------------------------
Proven                 3,342        191   0.25   0.67           20.5
--------------------------------------------------------------------
Probable              15,118        172   0.19   0.62           83.6
--------------------------------------------------------------------
Subtotal In-pit       18,460        175   0.21   0.62          104.1
--------------------------------------------------------------------
Jig Tails (Probable)     400        234   0.37   0.13            3.0
--------------------------------------------------------------------
Total Project         18,860        177   0.21   0.61          107.1
--------------------------------------------------------------------
(i) Based on metal prices of US$5.35 per ounce of silver, US$2.75
    per pound of tin and US$0.42 per pound of zinc and recoveries of
    57% for tin and determined by the following formulas for silver
    ("Ag") and zinc ("Zn"): Ag recovery equals 0.00000623 x (Ag
    grade cubed)-0.004 x (Ag grade squared)+ 0.8633 x 
    Ag grade+17.865; and Zn recovery equals 32.925 x Zn grade 
    cubed - 107.78 x Zn grade squared+130.78 x Zn grade+0.6629.

Pirquitas 43-101 Report - Resources (i)
--------------------------------------------------------------------
                                                           Contained
                                                              Silver
                                 Silver    Tin   Zinc            (oz.
Class                    (kt)  (g/tonne)    (%)    (%)   in millions)
--------------------------------------------------------------------
Measured                0.71        112   0.17   0.67            2.5
--------------------------------------------------------------------
Indicated               7.91         95   0.09   0.45           24.2
--------------------------------------------------------------------
(i) 30 grams silver per tonne cut-off



Based on the results of the technical report, estimated project after-tax net present values and internal rates of return are set out in the table below for various metal prices.

Summary of Financial Analysis
--------------------------------------------------------------------
Description       Metal prices                          Unit Costs
--------------------------------------------------------------------
                                                      Cash
                                                     costs     Total
           Silver      Tin     Zinc    NPV0   IRR  (US$/oz)    costs
          (US$/oz) (US$/lb) (US$/lb) (M US$)   (%)      (3)  (US$/oz)
--------------------------------------------------------------------
20 Year
 Average
 Metal
 Price(1)    5.35     2.75     0.42    50.6   5.1%    2.95      5.13
--------------------------------------------------------------------
Selected
 Metal
 Prices      6.25     3.00     0.55   124.9  12.5%    2.72      4.86
--------------------------------------------------------------------
18 Month
 Average
 Metal 
 Price(2)    7.16     3.56     0.58   195.3  19.2%    2.42      4.53
--------------------------------------------------------------------
12 Month
 Average
 Metal
 Price(2)    7.55     3.40     0.66   216.6  21.2%    2.46      4.54
--------------------------------------------------------------------
Last 6
 Month
 Average
 Metal
 Price(2)    7.95     3.10     0.74   234.2  22.9%    2.57      4.63
--------------------------------------------------------------------
Prices -
 April 4,
 2006       11.75     3.79     1.23   495.6  42.2%    1.93      3.83
--------------------------------------------------------------------
Prices -
 April 25,
 2006       12.47     4.23     1.52   563.1  46.6%    1.49      3.36
--------------------------------------------------------------------
(1) Silver, as of March 31, 2006
(2) As of Dec. 31, 2005
(3) Includes by-product credit



John Wells, Hatch Ltd. (Hatch), is the Qualified Person responsible for process plant and infrastructure; Scott Hardy, Mine Development Associates, Inc. (MDA), is the Qualified Person responsible for proven and probable reserves and mining costs; Steve Ristorcelli, Mine Development Associates, is the Qualified Person responsible for mineral resources; and Hatch and MDA are responsible for capital and operating costs. Investors are cautioned that this report will contain qualifications, assumptions and exclusions that may be relevant to an investment decision and the summary information set out above should, if it is to be fully and properly understood, be read in the context of the entire report.

To receive Silver Standard's news releases by e-mail, contact Paul LaFontaine, Director, Investor Relations at invest@silverstandard.com or call (888) 338-0046.

Statements contained in this news release that are not historical fact, such as statements regarding the economic prospects of the company's projects, future plans or future revenues, timing of development or potential expansion or improvements, are forward-looking statements as that term is defined in the Private Securities Litigation Reform Act of 1995. Such forward-looking statements are subject to risks and uncertainties which could cause actual results to differ materially from estimated results. Such risks and uncertainties include, but are not limited to, the company's ability to raise sufficient capital to fund development, changes in economic conditions or financial markets, changes in prices for the company's mineral products or increases in input costs, litigation, legislative, environmental and other judicial, regulatory, political and competitive developments in Argentina or Canada, technological and operational difficulties or inability to obtain permits encountered in connection with exploration and development activities, labour relations matters, and changing foreign exchange rates, all of which are described more fully in the company's filings with the Securities and Exchange Commission.

Cautionary note to U.S. investors: The terms "measured mineral resource", "indicated mineral resource", and "inferred mineral resource" used in this news release are Canadian geological and mining terms as defined in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves. We advise U.S. investors that while such terms are recognized and required under Canadian regulations, the U.S. Securities and Exchange Commission (the "SEC") does not recognize these terms. "Inferred mineral resources" in particular have a great amount of uncertainty as to their economic feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules estimates of inferred mineral resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part of all of an inferred mineral resource exists, or is economically or legally mineable. Disclosure of contained metal expressed in ounces is in compliance with NI 43-101, but does not meet the requirements of Industry Guide 7 of the SEC, which will only accept the disclosure of tonnage and grade estimates for non-reserve mineralization.

The TSX has neither approved nor disapproved of the information contained herein.

CONTACT INFORMATION

Silver Standard Resources Inc.
Robert A. Quartermain
President
(604) 689-3846
Fax: (604) 689-3847

or

Silver Standard Resources Inc.
Paul LaFontaine
Director, Investor Relations
N.A. Toll Free: 1-888-338-0046 or Direct: (604) 484-8212
invest@silverstandard.com
www.silver-standard.com
View All News

Email Alerts

*
*

 
Enter the code shown above.
*

SSR Mining Inc logo
Copyright © SSR Mining.
All Rights Reserved.
Terms and Conditions Privacy Policy
Powered By Q4 Inc. 5.193.2.1 (opens in new window)