VANCOUVER, BRITISH COLUMBIA, May 14, 2007 (CCNMatthews via COMTEX News Network) -- Silver Standard Resources Inc. (TSX:SSO)(NASDAQ:SSRI) reports a first quarter loss of $1.6 million ($0.03 per share) compared with a loss of $1.1 million ($0.02 per share) for the first quarter of 2006. All figures are in Canadian dollars unless otherwise noted.
Financial highlights for the period included:
- Property expenditures total $17.4 million on various properties in Q1 2007 including Pirquitas construction costs of $3.1 million and payments for mining equipment of $6.1 million, Pitarilla exploration expenditures of $4.0 million and San Luis joint venture exploration expenditures of $1.7 million.
- Working capital at quarter-end of $270.7 million with no long-term debt. Working capital included silver bullion which is carried at cost, and based on market value has an additional value of $14.3 million at March 31, 2007.
Selected Financial Data
(CDN$000's, except per share amounts)
This summary of selected financial data should be read in conjunction
with the management discussion and analysis ("MD&A") of the unaudited
consolidated operating results and financial condition of the company
for the three months ended March 31, 2007 and 2006, and the
Consolidated Financial Statements and the related notes thereto, as
well as the MD&A and audited Financial Statements and notes for the
year ended December 31, 2006.
-----------------------------------------------------------------------
Three Months
Ended Mar. 31
-----------------------------------------------------------------------
2007 2006
-----------------------------------------------------------------------
Loss 1,565 1,081
-----------------------------------------------------------------------
Loss per share (basic and diluted) 0.03 0.02
-----------------------------------------------------------------------
Cash generated by (used in) operating activities 1,627 (1,224)
-----------------------------------------------------------------------
Cash generated by financing activities 3,899 29,077
-----------------------------------------------------------------------
Cash used in investing activities 21,074 13,020
-----------------------------------------------------------------------
March 31 December 31
Financial Position 2007 2006
-----------------------------------------------------------------------
Cash and cash equivalents 214,068 229,616
-----------------------------------------------------------------------
Silver bullion 15,787 15,787
-----------------------------------------------------------------------
Marketable securities 43,716 5,817
-----------------------------------------------------------------------
Current assets - total 278,341 255,596
-----------------------------------------------------------------------
Current liabilities - total 7,680 5,362
-----------------------------------------------------------------------
Working capital 270,661 250,234
-----------------------------------------------------------------------
Shareholders' equity 475,329 436,570
-----------------------------------------------------------------------
Project Updates
Pirquitas, Argentina In April 2006, Hatch Ltd. completed a feasibility study update (FSU) for Pirquitas that projected capital costs for a 6,000 tonne/day mining operation at US$146 million plus refundable value added taxes. To March 31, 2007, Silver Standard has spent a total of approximately US$10.7 million with a further US$20.8 million committed or locked in, for a total of approximately US$31.5 million. These expenditures and commitments include the ball mill, flotation cells, truck shop, a mining fleet that consists of seven trucks, shovel, cranes and graders which are at FSU budget estimates.
The Techint Group, an Argentine-based multinational engineering firm, is the EPCM contractor for Pirquitas. Techint has completed preliminary engineering and detailed engineering is underway with construction to commence in the third quarter of this year for a fourth quarter 2008 mill start-up. Since completion of the FSU, some of the estimated costs have been impacted by higher global material and labour costs. Consumer prices in Argentina climbed over 9% in 2006 and are near that level to date in 2007. The company will update capital costs when detailed engineering is completed.
Pirquitas ore reserves from the FSU were calculated using US$5.35/oz. silver, US$2.75/lb. tin and US$0.42/zinc. The mine model is being reviewed using US$9.35/oz. silver, US$3.65/lb. tin and US$1.00/lb. zinc. An updated reserve estimate is expected to accompany the capital cost update in the third quarter.
San Luis, Peru Diamond drilling continues on the Ayelen Vein and the five other veins identified to date on the 250 sq. km (approximately 96 square mile) mineral concession held by a joint venture with Esperanza Silver Corporation. The Ayelen Vein is host to high-grade gold-silver mineralization that has been outlined over 550 meters along strike and over 200 meters to depth. The vein remains open along strike and to depth. A program of mapping and sampling on the large property has commenced and is aimed at identifying the source for a number of stream sediment geochemical anomalies discovered in a 2006 sampling program.
In the first quarter of 2007, Silver Standard became operator and elected to increase its interest in the joint venture to 70% by completing a feasibility study.
Pitarrilla, Mexico Subsequent to the end of the first quarter, the company reported a 28% increase in silver resources at Pitarrilla as well as a significant zinc and lead resource. All of the increase came from drilling of the Breccia Ridge Zone. For additional details, refer to the news release dated April 10, 2007 on the company's web site (www.silverstandard.com). Drilling is ongoing with five diamond drills on the property. Infill and extension drilling is presently focused on the Breccia Ridge Zone along strike and to depth, and continues to intersect significant silver and base metal mineralization at depth. The board of directors of the company has approved a US$12.5 million underground program to commence once permits are in place.
To prioritize exploration targets, Silver Standard completed an airborne geophysical survey over the 139 sq. km (50 square mile) Pitarrilla mineral concessions. The company is planning for two additional rigs for drilling at depth on other zones as well as new targets. The extensive surface drilling and underground programs during 2007 will lead to commencement of a feasibility study late this year.
Other Developments
Diablillos / Snowfield Silver Standard will commence a 15,000 meter program of diamond drilling in the second quarter at its wholly-owned Diablillos silver-gold project in Argentina. The objective of the program is to better define the inferred resource of 93.8 million ounces of silver resources and 815,000 ounces of gold resources. Planning is also underway for a 15,000 meter follow-up program at the wholly-owned Snowfield property in Canada. In 2006, Silver Standard reported an initial measured and indicated gold resource of 2.35 million ounces and an inferred resource of 655,000 ounces. The property has excellent potential for increasing gold resources and updated resource estimates for both Diablillos and Snowfield are anticipated in the fourth quarter of 2007.
For the full First Quarter 2007 report, including a Management Discussion & Analysis, and unaudited consolidated interim financial statements, visit www.sedar.com or the company's web site at www.silverstandard.com. A conference call to review third quarter results and project activities is scheduled on Monday, May 14, 2007 at 10:00 a.m. EST.
Toll-free in North America: 1-866-400-3310
Toronto local and overseas: 1-416-850-9144
Replay will be available for one week by calling toll free in North America: 1-866-245-6755, passcode 545338; local and overseas callers may telephone 1-416-915-1035, passcode 545338. The audio file will also be available on the company's web site after May 14, 2007. (SSRI-FI)
Cautionary note to U.S. investors: The terms "measured mineral resource", "indicated mineral resource", and "inferred mineral resource" used in this news release are Canadian geological and mining terms as defined in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves. We advise U.S. investors that while such terms are recognized and required under Canadian regulations, the U.S. Securities and Exchange Commission (the "SEC") does not recognize these terms. "Inferred mineral resources" in particular have a great amount of uncertainty as to their economic feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules estimates of inferred mineral resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part of all of an inferred mineral resource exists, or is economically or legally mineable. Disclosure of contained metal expressed in ounces is in compliance with NI 43-101, but does not meet the requirements of Industry Guide 7 of the SEC, which will only accept the disclosure of tonnage and grade estimates for non-reserve mineralization.
SOURCE: Silver Standard Resources Inc.
Silver Standard Resources Inc.
Robert A. Quartermain
President
(604) 689-3846
(604) 689-3847 (FAX)
Silver Standard Resources Inc.
Paul LaFontaine
Director, Investor Relations