VANCOUVER, BRITISH COLUMBIA, Jun 1, 2010 (Marketwire via COMTEX News Network) -- Silver Standard Resources Inc. (TSX:SSO)(NASDAQ:SSRI) is pleased to report the positive results from a National Instrument 43-101 compliant Preliminary Assessment on its wholly-owned Snowfield Project located in northern British Columbia, Canada. The project includes development of an open pit mine, a processing plant, infrastructure, waste rock storage and tailing impoundment areas to recover the mineralization identified to date. The Preliminary Assessment was prepared by Wardrop Engineering Inc., a Tetra Tech Company ("Wardrop").
Study Highlights
Based on the Preliminary Assessment, the Snowfield Project will be operated as an open pit mine with an average life-of-mine waste to mineral material stripping ratio of 0.54:1 and a 120,000 tonnes per day mill feed rate. Snowfield's mine life is
estimated at approximately 23 years. An annual average of 607,000 ounces of gold
(contained in concentrate and dore), 57.8 million pounds of copper (contained in concentrate), 1.5 million ounces of silver (contained in concentrate and dore) and 4.5 million pounds of molybdenum (contained in concentrate) will be produced from the mill.
Capital expenditures, including contingencies, are estimated to be US$3.4 billion. The Snowfield Project has an estimated pre-tax net present value of US$877 million (5% discount rate) and an internal rate of return of 8.1% using base case metals prices of US$878/ounce gold, US$14.50/ounce silver, US$17/pound molybdenum and US$2.95/pound copper. The Preliminary Assessment is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied that would enable them to be categorized as mineral reserves. There is no certainty that the Preliminary
Assessment will be realized.
Preliminary results from an ongoing metallurgical program indicate the potential for significant rhenium recoveries at Snowfield. The potential impact of rhenium on the project's economics, as well as the inclusion of the higher-grade gold and silver resources of the company's adjacent Brucejack Project (summarized in Table 6), will be examined in an updated Preliminary Assessment which is already underway.
Production & Processing
The estimated mining inventory is comprised of 966 million tonnes with an average mill feed grade of 0.64 g/t gold, 1.67 g/t silver, 0.105% copper and 0.009% molybdenum and which contains 20.0 million ounces of gold, 51.9 million ounces of silver, 2.2 billion pounds of copper and 196.6 million pounds of molybdenum based on the Snowfield mineral resource estimate dated December 1, 2009 and summarized in Table
5.
The processing plant will produce a copper-gold-silver concentrate, a molybdenum concentrate and a gold-silver dore. The following table summarizes the associated production and processing parameters:
Table 1: Projected Production and Processing Summary
Mine Type: Open pit
---------------------------------------------------------------------------
Total Mine Production: 966 million tonnes
---------------------------------------------------------------------------
Processing Rate: 120,000 tonnes per day
---------------------------------------------------------------------------
Mine Life (LOM): 23 years
---------------------------------------------------------------------------
Strip Ratio: 0.54:1 waste to mineral material
---------------------------------------------------------------------------
Copper Gold-Silver Molybdenum
Production Parameters Concentrate Dore Concentrate
---------------------------------------------------------------------------
Average Product Grade:
---------------------------------------------------------------------------
Gold 110 g/t 32.3% -
---------------------------------------------------------------------------
Copper 22% - -
---------------------------------------------------------------------------
Silver 303 g/t 67.7% -
---------------------------------------------------------------------------
Molybdenum - - 50%
---------------------------------------------------------------------------
Average Metal Recoveries:
---------------------------------------------------------------------------
Gold (%) 44.6 22.3 -
---------------------------------------------------------------------------
Copper (%) 56.9 - -
---------------------------------------------------------------------------
Silver (%) 47.6 18.0 -
---------------------------------------------------------------------------
Molybdenum (%) - - 50%
---------------------------------------------------------------------------
Average Annual Production(1):
---------------------------------------------------------------------------
Gold (000 oz's) 405 202 -
---------------------------------------------------------------------------
Copper (tonnes) 26,237 - -
---------------------------------------------------------------------------
Silver (000 oz's) 1,121 424 -
---------------------------------------------------------------------------
Molybdenum (tonnes) - - 2,020
---------------------------------------------------------------------------
(1) Refers to the average contained-in-concentrate production for the
Copper Concentrate and Molybdenum Concentrate and contained ounces for
the Gold-Silver Dore.
Capital and Operating Costs
The total capital cost for the Snowfield project is estimated at US$3.4 billion and the operating cost is estimated at US$8.52/tonne milled. The following tables summarize the break-down of capital costs and operating costs:
Table 2: Capital Costs Summary Table 3. Operating Costs Summary
Capital Costs (US$ millions) Operating Costs (US$/tonne milled)
----------------------------------- -------------------------------------
Direct Costs $2,146 Mining $ 2.28
----------------------------------- -------------------------------------
Indirect Costs $ 661 Processing $ 5.43
----------------------------------- -------------------------------------
Owner's Costs $ 98 General & Administrative $ 0.62
----------------------------------- -------------------------------------
Contingencies $ 474 Plant Services $ 0.19
----------------------------------- -------------------------------------
Total Capital Costs $3,378 Total Operating Costs $ 8.52
----------------------------------- -------------------------------------
Economic Analysis
The base case economic analysis projects that the Snowfield Project would have a net present value of US$877 million (5% discount rate) and an internal rate of return of 8.1%. A second case was presented using recent spot metals prices. The pre-tax economic results for both cases are presented in Table 4:
Table 4: Summary of Snowfield Pre-Tax Economic Results
Base Case Spot Prices
Economic Returns Scenario(1) at April 8, 2010
---------------------------------------------------------------------------
Internal Rate of Return 8.1% 16.3%
---------------------------------------------------------------------------
Net Cash Flow $3.2 billion $7.8 billion
---------------------------------------------------------------------------
Net Present Value (5.0% discount rate) $877 million $3.6 billion
---------------------------------------------------------------------------
Payback 7.4 years 4.5 years
---------------------------------------------------------------------------
Exchange Rate (US$: C$) $ 0.92 $ 0.92
---------------------------------------------------------------------------
Gold Price ($/ounce) $ 878 $ 1,150
---------------------------------------------------------------------------
Silver Price ($/ounce) $ 14.50 $ 18.10
---------------------------------------------------------------------------
Molybdenum Price ($/pound) $ 17.00 $ 19.54
---------------------------------------------------------------------------
Copper Price ($/pound) $ 2.95 $ 3.50
---------------------------------------------------------------------------
(1) Wardrop-adopted consensus forecast metal prices from the Energy Metals
Consensus Forecast (EMCF). All prices are in U.S. dollars.
Project Status
An update to the Preliminary Assessment for the Snowfield Project is underway to incorporate the contribution of the property's rhenium mineralization and the gold and silver mineralization from the adjacent Brucejack property. Completion of the update is anticipated in the fourth quarter of 2010 and a pre-feasibility study for the Project is planned to follow. To this end, a 42,000-meter drill program is underway, primarily to focus on expanding the current Snowfield - Brucejack mineral resource. Other field activities in the summer of 2010 will include collection of geotechnical and large diameter drilling, as well as other field data, to support the preparation of the pre-feasibility study.
The current mineral resources for the Snowfield Project and Brucejack Project are summarized in the tables below.
Table 5: Snowfield Zone Resource Summary - December 2009(1, 2, 4)
(Based on a cut-off grade of 0.35 grams of gold-equivalent/tonne)
Contained
-------------------
Gold Silver
Tonnes Gold Silver Copper Moly(3) (oz in (oz in
Category (millions) (g/t) (g/t) (%) (ppm) millions) millions)
---------------------------------------------------------------------------
Measured 136.9 0.94 1.7 0.11 99 4.14 7.7
---------------------------------------------------------------------------
Indicated 724.8 0.67 1.9 0.12 91 15.63 43.2
---------------------------------------------------------------------------
M+I 861.7 0.71 1.8 0.12 92 19.77 50.9
---------------------------------------------------------------------------
Inferred 948.9 0.33 1.4 0.07 81 10.05 43.7
---------------------------------------------------------------------------
(1) See Technical Report and Updated Resource Estimate on the Snowfield
Property dated December 1, 2009 and filed on SEDARwww.sedar.com January
14, 2010.
(2) Prepared by Eugene Puritch, P.Eng., F.H. Brown, M.Sc. (Eng.), CPG
PrSciNat, and Tracy Armstrong, P.Geo., of P&E Mining Consultants Inc.
("P&E") of Brampton, Ontario, independent qualified persons, as defined
by National Instrument 43-101.
(3) "Moly" refers to molybdenum.
(4) Mineral resources that are not mineral reserves do not have
demonstrated economic viability. The estimate of mineral reserves may
be materially affected by environmental, permitting, legal, title,
taxation, socio-political, marketing or other relevant issues.
Table 6: Brucejack Area Resource Summary - December 2009(1, 2, 3)
(Based on a cut-off grade of 0.35 grams of gold-equivalent/tonne)
Contained
--------------------------
Gold
Tonnes Gold Silver (oz in Silver
Category (millions) (g/t) (g/t) millions) (oz in millions)
---------------------------------------------------------------------------
Measured 9.9 2.06 75.0 0.66 23.8
---------------------------------------------------------------------------
Indicated 110.7 0.95 11.7 3.38 41.6
---------------------------------------------------------------------------
M+I 120.5 1.04 16.9 4.04 65.4
---------------------------------------------------------------------------
Inferred 198.0 0.76 11.2 4.87 71.5
---------------------------------------------------------------------------
(1) See Technical Report and Resource Estimates on the West, Bridge, Galena
Hill, Shore, SG & Gossan Hill Gold and Silver Zones of the Brucejack
Property dated December 1, 2009 and filed on SEDAR www.sedar.com
January 14, 2010.
(2) Prepared by Dr. Wayne D. Ewert, P.Geo., Tracy Armstrong, P.Geo., F.H.
Brown, M.Sc. (Eng.), CPG PrSciNat, and Eugene Puritch, P.Eng., of P&E
Mining Consultants Inc. ("P&E") of Brampton, Ontario, independent
qualified persons, as defined by National Instrument 43-101.
(3) See note 4 to Table 5 above.
Independent Qualified Persons
The following Qualified Persons (as defined by National Instrument 43-101) are independent of Silver Standard and responsible for the Snowfield Project Preliminary Assessment:
Qualified Person Scope of Responsibility
Grant Bosworth, P.Eng. Overall report preparation, capital cost
Wardrop Engineering Inc. estimate
----------------------------------------------------------------------------
John Huang, P.Eng. Metallurgical testing review, mineral
Wardrop Engineering Inc. processing, process operating costs and
infrastructure with exception to power,
tunneling and roads
----------------------------------------------------------------------------
Tracy Armstrong, P.Geo. Report sections preparation for the Snowfield
P&E Mining Consultants Inc. NI 43-101 Technical Report
----------------------------------------------------------------------------
Fred Brown, CPG Pr.Sci.Nat. Mineral resource modelling and analysis
P&E Mining Consultants Inc.
----------------------------------------------------------------------------
Nory Narciso, P.Eng. Mine design, production scheduling, mine
Wardrop Engineering Inc. capital and operating costs and financial
analysis
----------------------------------------------------------------------------
Iouri Iakovlev, P.Eng. Tunnel design and associated capital costs
Wardrop Engineering Inc.
----------------------------------------------------------------------------
Mike Boyle, P.Eng. Roads design, access and site roads/earthworks
SJA Canada Ltd.
----------------------------------------------------------------------------
Malcolm Cameron, P.Eng. Power supply design and associated costs
Wardrop Engineering Inc.
----------------------------------------------------------------------------
Lori-Ann Wilchek, P.Eng. Tailing impoundment, water management plan,
BGC Engineering Inc. overall water balance, and conceptual closure
planning
----------------------------------------------------------------------------
Warren Newcomen, M.Sc. Waste rock, open pit slopes design and
BGC Engineering Inc. conceptual closure planning
----------------------------------------------------------------------------
Pierre Pelletier, P.Eng. Environmental concerns and permitting, capital
Rescan Environmental and operating costs estimates as they relate to
Services Ltd. environmental component of the study
Silver Standard Resources Inc. is a silver mining company that intends to grow through exploration and the development of its project pipeline.
Forward Looking Statements: Certain statements in this news release, including statements relating to the estimates to complete preliminary assessments and pre-feasibility studies relating to the Snowfield Project, mineral resource estimates and capital expenditures, production and economic return estimates, are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws (collectively, "forward-looking statements"). Forward-looking statements are statements that are not historical facts and that are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially
from those reflected in the forward-looking statements. Such risks and uncertainties include, but are not limited to, the Company's ability to raise sufficient capital to fund development; changes in economic conditions or financial markets; uncertainty of production and cost estimates for the Pirquitas Mine; the Company's history of losses and expectation of future losses; changes in prices for the Company's mineral products or increases in input costs; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments in Argentina, Australia, Canada, Chile, Mexico, Peru, the United States and other jurisdictions in which the Company may carry on business; technological and operational difficulties or inability to obtain permits encountered in connection with exploration and development activities; labour relations matters; and changing foreign
exchange rates, all of which are described more fully in the Company's most recent Form 20-F and other filings with the Securities and Exchange Commission and Canadian regulatory authorities. The Company does not intend, and does not assume any obligation, to update any forward-looking statements, other than as required by applicable law.
Cautionary note to U.S. investors: The terms "measured mineral resource", "indicated mineral resource", and "inferred mineral resource" used in this news release are Canadian geological and mining terms as defined in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves. We advise U.S. investors that while such terms are recognized and permitted
under Canadian regulations, the SEC does not recognize them. U.S. investors are cautioned not to assume that any part or all of the mineral deposits in the measured and indicated categories will ever be converted into reserves. "Inferred mineral resources" in particular have a great amount of uncertainty as to their economic feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules estimates of inferred mineral resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. Disclosure of contained metal expressed in ounces is in compliance with NI 43-101, but does not meet the requirements of Industry Guide 7 of the SEC, which will
only accept the disclosure of tonnage and grade estimates for non-reserve mineralization. (Source: Silver Standard Resources Inc.)
SOURCE: Silver Standard Resources Inc.
Silver Standard Resources Inc.
Paul LaFontaine
Director, Investor Relations
(604) 484-8212 or N.A. Toll Free: 1-888-338-0046
(604) 689-3847 (FAX)
invest@silverstandard.com
www.silverstandard.com
Copyright (C) 2010 Marketwire. All rights reserved.
News Provided by COMTEX