VANCOUVER, Oct. 7, 2014 /CNW/ - Silver Standard Resources Inc. (NASDAQ:
SSRI) (TSX: SSO) ("Silver Standard") provides its third quarter 2014
operational update for the Pirquitas mine in Jujuy, Argentina and the
Marigold mine in Nevada, U.S.
Third Quarter 2014 Operating Highlights:
-
Exceeded gold production schedule at Marigold: Produced 40,442 ounces of gold 83% higher than in the previous quarter
and 23% higher than the third quarter guidance of 33,000 ounces. As a
result, Marigold is on track to exceed 2014 production guidance.
-
Delivered strong production at Pirquitas: Record 2.6 million ounces of silver produced, 25% higher than in the
previous quarter, and 7.0 million pounds of zinc, on track to deliver
full year guidance.
"With both our mines performing strongly the second half of 2014 is
reflecting the focus and discipline applied in our business," said John
Smith, President and CEO. "Both Pirquitas and Marigold have delivered
to plan through the rigorous application of operational excellence.
These operational results underscore how important good people working
to plan and executing on strong processes are to our business."
Pirquitas mine, Argentina
|
|
|
Q3 2014
|
Q2 2014
|
% Change
|
|
Total material mined
|
kt
|
4,315
|
4,052
|
6.5%
|
|
Waste removed
|
kt
|
3,831
|
3,550
|
7.9%
|
|
Strip ratio
|
w/o
|
7.9
|
7.1
|
12.0%
|
|
Silver mined grade
|
g/t
|
160
|
167
|
(4.1%)
|
|
Zinc mined grade
|
%
|
1.36
|
2.07
|
(34.3%)
|
|
Ore milled
|
kt
|
407
|
402
|
1.2%
|
|
Silver mill feed grade
|
g/t
|
248
|
213
|
16.3%
|
|
Zinc mill feed grade
|
%
|
1.79
|
2.19
|
(18.1%)
|
|
Silver recovery
|
%
|
78.7
|
74.3
|
6.0%
|
|
Zinc recovery (zinc concentrate)
|
%
|
44
|
48
|
(8.8%)
|
|
Silver produced
|
'000 oz
|
2,551
|
2,042
|
24.9%
|
|
Zinc produced (zinc concentrate)
|
'000 lbs
|
7,030
|
9,319
|
(24.6%)
|
|
Silver sold
|
'000 oz
|
1,859
|
1,926
|
(3.3%)
|
|
Zinc sold (zinc concentrate)
|
'000 lbs
|
8,062
|
5,307
|
51.9%
|
Note: Percent changes are calculated using rounded numbers presented in the
table.
The Pirquitas mine produced 2.6 million ounces of silver during the
third quarter of 2014, higher than the 2.0 million ounces produced in
the second quarter of 2014, and on track to meet full year guidance.
The mine also produced 7.0 million pounds of zinc in zinc concentrate
in the third quarter. The quarter-on-quarter increase in silver
production is due to an increase in mill feed grade and better silver
recoveries. During the third quarter, we recognized sales of 1.9
million ounces of silver and 8.1 million pounds of zinc.
Mill throughput was in line with the second quarter and continued to be
11% above the mill's nominal design. Ore milled during the third
quarter contained an average silver grade of 248 g/t, higher than the
213 g/t reported in the second quarter. The average recovery rate for
silver increased to 78.7% from 74.3% in the previous quarter due to a
greater proportion of fresh sulphide ore being milled. The increase in
milled grade was due to blending mine feed with previously mined
stockpiled material.
Marigold mine, U.S.
|
|
|
Q3 2014
|
Q2 2014
|
% Change
|
|
Total material mined
|
kt
|
18,832
|
18,338
|
2.7%
|
|
Waste removed
|
kt
|
13,821
|
15,986
|
(13.5%)
|
|
Strip ratio
|
w/o
|
2.8
|
6.8
|
(59.4%)
|
|
Ore to leach pad
|
kt
|
5,011
|
2,352
|
113.1%
|
|
Gold grade to leach pad
|
g/t
|
0.53
|
0.34
|
56.2%
|
|
Gold recovery
|
%
|
73%
|
73%
|
0.0%
|
|
Gold produced
|
oz
|
40,442
|
22,060
|
83.3%
|
|
Gold sold
|
oz
|
38,245
|
21,990
|
73.9%
|
Note: Second quarter 2014 data presented in this table is for the period April
1 to June 30, 2014, the period for which Silver Standard was entitled
to all economic benefits of the Marigold mine per the Purchase and Sale
Agreement dated April 4, 2014.
During the third quarter of 2014, the Marigold mine produced 40,442
ounces of gold, significantly higher than the second quarter production
of 22,060 ounces of gold and on track to exceed 2014 production
guidance. Gold sales totaled 38,245 ounces for the quarter.
The majority of ore mined in the third quarter was from the Mackay Phase
1 pit which benefited from stripping activity done during the second
quarter that provided direct access to higher grade material. A total
of 18.8 million tonnes of material were mined in the third quarter of
2014, of which 5.0 million tonnes of ore were delivered to the heap
leach pads at a grade of 0.53 g/t gold, consistent with our plan for
the year. This compares to 18.3 million tonnes of total material moved
in the second quarter, with 2.4 million tonnes of ore delivered to the
heap leach pads at a grade of 0.34 g/t gold.
Third Quarter Earnings Release
Silver Standard plans to issue its third quarter earnings release on
Wednesday, November 5, 2014 after markets close.
Qualified Persons
The scientific and technical data contained in this news release
relating to the Pirquitas mine has been reviewed and approved by Trevor
J. Yeomans, B.Sc. (Hons), a Qualified Person under National Instrument
43-101 - Standards of Disclosure for Mineral Projects ("NI 34-101") and
our Director, Metallurgy. The scientific and technical data contained
in this news release relating to the Marigold mine has been reviewed
and approved by Thomas Rice, SME Registered Member, a Qualified Person
under NI 43-101 and our Technical Services Manager at the Marigold
mine.
To receive Silver Standard's news releases by e-mail, please register
using the Silver Standard website at www.silverstandard.com.
Cautionary Note Regarding Forward-Looking Statements:
This news release contains "forward-looking statements" within the
meaning of the U.S. Private Securities Litigation Reform Act of 1995
and "forward-looking information" within the meaning of Canadian
securities laws (collectively, "forward-looking statements") concerning
the anticipated developments in our operations in future periods, and
other events or conditions that may occur or exist in the future. These
statements relate to analyses and other information that are based on
forecasts of future results, estimates of amounts not yet determinable
and assumptions of management.
Generally, forward-looking statements can be identified by the use of
words or phrases such as "expects," "anticipates," "plans," "projects,"
"estimates," "assumes," "intends," "strategy," "goals," "objectives,"
"potential" or variations thereof, or stating that certain actions,
events or results "may," "could," "would," "might" or "will" be taken,
occur or be achieved, or the negative of any of these terms or similar
expressions. These forward-looking statements are subject to a variety
of known and unknown risks, uncertainties and other factors that could
cause actual events or results to differ from those expressed or
implied, including, without limitation, the following: uncertainty of
production, development plans and cost estimates for the Pirquitas mine
and the Marigold mine; future development risks, including start-up
delays and operational issues; our ability to replace Mineral Reserves;
our ability to complete and successfully integrate announced
acquisitions, including the Marigold mine acquisition; our ability to
obtain adequate financing for further exploration and development
programs; commodity price fluctuations; political or economic
instability and unexpected regulatory changes; currency fluctuations,
particularly the value of the Argentine peso against the U.S. dollar;
the possibility of future losses; general economic conditions; the
recoverability of our interest in Pretium Resources Inc. ("Pretium")
and our other marketable securities, including the price of and market
for Pretium's common shares and such other marketable securities;
potential export duty on current and past production of silver
concentrate from the Pirquitas mine; recoverability and tightened
controls over the VAT collection process in Argentina; counterparty and
market risks related to the sale of our concentrates and metals;
differences in U.S. and Canadian practices for reporting Mineral
Reserves and Mineral Resources; uncertainty in the accuracy of Mineral
Reserves and Mineral Resources estimates and in our ability to extract
mineralization profitably; uncertainty in acquiring additional
commercially mineable mineral rights; lack of suitable infrastructure
or damage to existing infrastructure; delays in obtaining or failure to
obtain governmental permits, or non-compliance with permits we have
obtained; governmental laws and regulations, including health, safety
and environmental laws and regulations, increased costs and
restrictions on operations due to compliance with such regulations;
reclamation requirements for our exploration properties; unpredictable
risks and hazards related to the development and operation of a mine or
mine property that are beyond our control; compliance with
anti-corruption laws and increased regulatory compliance costs;
complying with emerging climate change regulations and the impact of
climate change; uncertainties related to title to our mineral
properties and the ability to obtain surface rights; recoverability of
deferred consideration to be received in connection with recent
divestitures; our insurance coverage; civil disobedience in the
countries where our properties are located; operational safety and
security risks; actions required to be taken by us under human rights
law; our ability to access, when required, mining equipment and
services; competition in the mining industry for properties; our
ability to attract and retain qualified personnel and management and
potential labour unrest, including labour actions by our unionized
employees at the Pirquitas mine; shortage or poor quality of equipment
or supplies; claims and legal proceedings, including adverse rulings in
current or future litigation against us and/or our directors or
officers, and assessments; and those other various risks and
uncertainties identified under the heading "Risk Factors" in our most
recent Form 40-F filed with the U.S. Securities and Exchange Commission
and Annual Information Form filed with Canadian securities regulatory
authorities.
This list is not exhaustive of the factors that may affect any of our
forward-looking statements. Our forward-looking statements are based on
what our management currently considers to be reasonable assumptions,
beliefs, expectations and opinions based on the information currently
available to it. Assumptions have been made regarding, among other
things: our ability to carry on our exploration and development
activities; our ability to meet our obligations under our property
agreements; the timing and results of drilling programs; the discovery
of Mineral Resources and Mineral Reserves on our mineral properties;
the timely receipt of required approvals and permits; the price of the
minerals we produce; the costs of operating and exploration
expenditures; our ability to operate in a safe, efficient and effective
manner; our ability to obtain financing as and when required and on
reasonable terms; and our ability to continue operating the Pirquitas
mine and the Marigold mine. You are cautioned that the foregoing list
is not exhaustive of all factors and assumptions which may have been
used. We cannot assure you that actual events, performance or results
will be consistent with these forward-looking statements, and
management's assumptions may prove to be incorrect. Our forward-looking
statements reflect current expectations regarding future events and
operating performance and speak only as of the date hereof and we do
not assume any obligation to update forward-looking statements if
circumstances or management's beliefs, expectations or opinions should
change other than as required by applicable law. For the reasons set
forth above, you should not place undue reliance on forward-looking
statements.
W. John DeCooman, Jr.
Vice President, Business Development and Strategy
Silver Standard Resources Inc.
Vancouver, BC
N.A. toll-free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: invest@silverstandard.com
SOURCE Silver Standard Resources Inc.
News Provided by Acquire Media