VANCOUVER, Aug. 6, 2014 /CNW/ - Silver Standard Resources Inc. (NASDAQ:
SSRI) (TSX: SSO) ("Silver Standard") reports consolidated financial
results for the second quarter ended June 30, 2014.
"The second quarter marked an important time for Silver Standard's
future. With the acquisition of the Marigold mine complete, we have
grown substantially to become the operator of two large open pit
mines," said John Smith, President and CEO. "Our silver-equivalent
production and sales increased by 81% and 91%, respectively, compared
to the first quarter and we are on track to achieve improved results
for the remainder of 2014. We continue to focus on the optimization and
life-of-mine plan for Marigold and consistent delivery at Pirquitas.
With the addition of our second producing mine, a healthy balance sheet
and proven management capability, we are positioned for further growth
and success."
Second Quarter 2014 Highlights:
(All figures are in U.S. dollars unless otherwise noted)
-
Completed Marigold mine acquisition: Purchase of the Marigold mine completed on April 4, 2014. Mine
operations are now integrated into Silver Standard. Acquisition cost
reduced to $268 million following post-quarter closing adjustments of
$7.3 million.
-
Lowered cash cost guidance at Pirquitas: Reported cash costs of $12.18 per payable ounce of silver sold, with
continued strong performance, enabling lowered cash cost guidance of
$12.00 to $13.00 per payable ounce of silver sold for 2014.
-
Cost reduction plans at Marigold delivering: Reported cash costs of $1,103 per payable ounce of gold sold.
Operating efficiencies improving on load and haul fleet.
-
Delivered higher metals production: Produced 2.0 million ounces of silver, 22,060 ounces of gold and 9.3
million pounds of zinc, on track to meet production guidance for the
year.
-
Doubled quarterly revenue: Revenue for the quarter totaled $64.3 million, compared to $33.7
million in the first quarter of 2014.
Pirquitas mine, Argentina
|
|
Three months ended
|
|
Operating data
|
June 30
2014
|
March 31
2014
|
December 31
2013
|
September 30
2013
|
June 30
2013
|
|
Total material mined (kt)
|
4,052
|
4,208
|
4,277
|
4,465
|
4,471
|
|
Waste removed (kt)
|
3,550
|
3,840
|
3,753
|
4,087
|
4,300
|
|
Strip ratio
|
7.1
|
10.4
|
7.2
|
10.8
|
25.2
|
|
Silver mined grade (g/t)
|
167
|
163
|
178
|
128
|
270
|
|
Zinc mined grade (%)
|
2.07
|
1.94
|
2.67
|
2.41
|
2.41
|
|
Mining cost ($/t mined)
|
2.80
|
2.40
|
2.90
|
2.77
|
3.05
|
|
Ore milled (kt)
|
402
|
406
|
420
|
394
|
365
|
|
Silver mill feed grade (g/t)
|
213
|
204
|
228
|
215
|
216
|
|
Zinc mill feed grade (%)
|
2.19
|
2.02
|
2.12
|
1.91
|
1.53
|
|
Processing cost ($/t milled)
|
21.13
|
20.09
|
20.74
|
22.51
|
29.92
|
|
Silver recovery (%)
|
74.3
|
72.1
|
73.9
|
74.6
|
74.8
|
|
Zinc recovery (%) (1)
|
48.0
|
48.9
|
53.0
|
47.0
|
46.0
|
|
|
|
|
|
|
|
|
Silver produced ('000 oz)
|
2,042
|
1,918
|
2,281
|
2,028
|
1,890
|
|
Zinc produced ('000 lbs) (1)
|
9,319
|
8,844
|
10,307
|
7,818
|
5,589
|
|
Silver sold ('000 oz)
|
1,926
|
1,596
|
2,499
|
1,969
|
2,207
|
|
Zinc sold ('000 lbs) (1)
|
5,307
|
10,227
|
14,208
|
4,952
|
2,217
|
|
|
|
|
|
|
|
|
Realized silver price ($/oz)
|
19.89
|
20.38
|
20.79
|
21.38
|
22.47
|
|
|
|
|
|
|
|
|
Cash costs ($/oz) (2)
|
12.18
|
12.36
|
11.75
|
13.32
|
13.03
|
|
Total costs ($/oz) (2)
|
16.34
|
17.42
|
17.75
|
21.24
|
20.05
|
|
|
|
|
|
|
|
|
Financial data ($000s)
|
|
|
|
|
|
|
Revenue
|
36,261
|
33,736
|
49,026
|
43,944
|
32,654
|
|
Income (loss) from mine operations
|
7,758
|
5,924
|
3,985
|
5,732
|
(18,971)
|
|
Capital investments (3)
|
3,200
|
2,514
|
6,950
|
7,184
|
7,118
|
|
Exploration expenditures
|
1,125
|
140
|
143
|
748
|
1,489
|
|
(1)
|
Data for zinc recoveries, production and sales relate only to zinc in
zinc concentrate as any zinc metal within our silver concentrate does
not generate revenue.
|
|
(2)
|
We report non-GAAP cost per payable ounce of silver sold to manage and
evaluate operating performance at the Pirquitas mine. See "Cautionary Note Regarding Non-GAAP Measures".
|
|
(3)
|
Excluding deferred stripping.
|
Mine production
The Pirquitas mine produced 2.0 million ounces of silver during the
second quarter of 2014, which is a 6.5% quarter-on-quarter increase and
reflects higher average mined grade and recovery. The marginally lower
mill throughput is in line with the life of mine plan and is expected
to increase in the second half of 2014.
The Pirquitas mine produced 9.3 million pounds of zinc in zinc
concentrate in the second quarter of 2014, a 5.4% quarter-on-quarter
increase reflecting a slightly higher average mine grade, which was
partially offset by a marginally lower recovery.
Approximately 402,000 tonnes of ore were milled during the second
quarter of 2014, compared to 406,000 tonnes in the first quarter of
2014. Ore was milled at an average rate of 4,423 tonnes per day during
the second quarter of 2014, 11% above the mill's nominal design. This
compares to an average milling rate of 4,514 tonnes per day in the
first quarter of 2014. The lower total ore tonnes processed were a
result of lower availability of the processing plant due to repairs and
planned maintenance in the second quarter of 2014.
Ore milled during the second quarter of 2014 contained an average silver
grade of 213 g/t, higher than the 204 g/t reported in the first quarter
of 2014. The average silver recovery rate of 74.3% was slightly higher
than the first quarter recovery rate of 72.1% due to accessing a
greater proportion of fresh sulphide ore in the pit.
Mine operating costs
Cash costs and total costs per payable ounce of silver sold are non-GAAP
financial measures. See "Cautionary Note Regarding Non-GAAP Measures".
Early in 2013, we commenced a cost reduction initiative at the Pirquitas
mine, which has continued into 2014 as part of a continuous improvement
process. The main focus has been on replacing third party contract
services, reducing staffing and implementing operational controls at
the mine and plant to drive efficiencies.
Cash costs, which include cost of inventory (excluding adjustments for
write downs and one-off restructuring costs), treatment and refining
costs, and by-product credits, were $12.18 per payable ounce of silver
sold in the second quarter of 2014 compared to $12.36 per payable ounce
of silver sold in the first quarter of 2014. Cash costs in the second
quarter of 2014 continue to reflect our cost management focus and are
marginally below our original 2014 cost guidance.
Total costs, which add silver export duties, depreciation, depletion and
amortization to cash costs, were $16.34 per payable ounce of silver
sold in the second quarter of 2014 comparable with $17.42 per payable
ounce of silver sold in the first quarter of 2014. Depletion,
depreciation and amortization was slightly lower on a per unit sold
basis in the second quarter of 2014 compared to the first quarter of
2014.
Mine sales
In the second quarter of 2014, we sold 1.9 million ounces of silver
compared to 1.6 million ounces in the first quarter of 2014, and 5.3
million pounds of zinc in the second quarter of 2014, compared to 10.2
million pounds sold in the first quarter of 2014. We expect shipments
of concentrate to approximate production in 2014, however, due to
changes in certain contract terms, sales recognized are expected to be
slightly below production. The decrease in zinc sales reflects the
timing of deliveries and a temporary third party labour interruption at
the port of loading during the quarter.
Exploration
At the Pirquitas mine, we are directing work towards replacing Mineral
Reserves and Mineral Resource and extending the mine life of the
operation. In support of these activities we continue mapping and
sampling to develop targets for drilling.
Marigold mine, U.S.
|
|
Three months ended
|
|
Operating data
|
June 30, 2014 (2)
|
|
Total material mined (kt)
|
18,338
|
|
Waste removed (kt)
|
15,986
|
|
Strip ratio
|
6.8
|
|
Mining cost ($/t mined)
|
1.70
|
|
Total ore stacked (kt)
|
2,352
|
|
Gold stacked grade (g/t)
|
0.34
|
|
Processing cost ($/t processed)
|
1.59
|
|
Gold recovery (%)
|
73.0
|
|
|
|
|
Gold produced (oz)
|
22,060
|
|
Gold sold (oz)
|
21,990
|
|
|
|
|
Realized gold price ($/oz)
|
1,285
|
|
|
|
|
Cash costs ($/oz) (1)
|
1,103
|
|
Total costs ($/oz) (1)
|
1,135
|
|
|
|
|
Financial data ($000s)
|
|
|
Revenue
|
28,026
|
|
Income from mine operations
|
3,264
|
|
Capital investments (3)
|
2,296
|
|
Exploration expenditures
|
458
|
|
(1)
|
We report non-GAAP cost per payable ounce of gold sold to manage and
evaluate operating performance at the Marigold mine. See "Cautionary
Note Regarding Non-GAAP Measures".
|
|
(2)
|
Data presented in this table is for the period April 1 to June 30, 2014,
the period for which Silver Standard was entitled to all economic
benefits of the Marigold mine per the Purchase and Sale Agreement dated
April 4, 2014.
|
|
(3)
|
Excluding deferred stripping.
|
Mine production
We produced 22,060 gold ounces in the second quarter of 2014, exceeding
our quarterly guidance by approximately 10%.
During the second quarter of 2014 the mine moved 18.3 million tonnes of
material, of which 2.4 million tonnes of ore was delivered to the heap
leach pad at a grade of 0.34 g /t of ore.
Mining activities centered on using the majority of the mining fleet for
the stripping of overburden and the mining of lower grade from Phase 1
of the Mackay Pit. The remaining fleet was used to mine from the Terry
Phase 2 Pit which contains slightly higher grades. Approximately 26,000
gold ounces were stacked on the pads at a recovery of 73%, which
represents 18,980 recoverable gold ounces. Lower grade ores were
stacked on the higher pad elevations of Cell 12 as planned to
facilitate the stacking of higher grade ores nearer to the liner in the
third and fourth quarters of 2014.
Mine operating costs
Cash costs and total costs per payable ounce of gold sold are non-GAAP
financial measures. See "Cautionary Note Regarding Non-GAAP Measures".
Cash costs in the quarter are impacted by the fair value attributed to
the leach pad inventory as part of the preliminary purchase price
allocation required under IFRS. The entire value attributed to leach
pad inventory was considered as a cash component with no allocation to
previously incurred depreciation.
Cash costs, which include all costs of inventory, refining costs and
royalties, were $1,103 per ounce of payable gold sold in the second
quarter of 2014.
Total costs, which include depreciation, depletion and amortization,
were $1,135 per ounce of payable gold sold in the second quarter of
2014. Depreciation, depletion and amortization was low in the second
quarter as the inventory acquired did not include any depreciation, so
we expect that this non-cash component will increase to normalized
levels over the next two quarters as depreciation is charged to
inventory.
Mine sales
A total of 21,990 gold ounces were sold during the second quarter of
2014 at an average price of $1,285 per ounce.
Mineral Resources and Mineral Reserves Compliance
We have commenced the compliance requirements under National Instrument
43-101- Standards of Disclosure for Mineral Projects ('NI 43-101") for Mineral Resources and Mineral Reserves, retaining
respectively AMEC Americas Limited and Independent Mining Consultants,
Inc. to provide technical oversight. Detailed work is underway to
define the most suitable strategic development plan for the Marigold
mine within prevailing market conditions.
Exploration
Exploration activities for the second quarter of 2014 consisted of
development work around the Mackay, Hercules and 5North areas with the
objective of replacing a portion of Mineral Reserves mined and adding
to Mineral Resources. During the second quarter of 2014, we drilled
6,878 meters in 48 reverse circulation holes and we are in the process
of evaluating the results.
Outlook
This section of the news release provides management's production and
cost estimates. Major capital and exploration expenditures are also
discussed. See "Cautionary Note Regarding Forward-Looking Statements."
We concluded the acquisition of the Marigold mine in Nevada, U.S. from
subsidiaries of Goldcorp Inc. and Barrick Gold Corporation on April 4,
2014.
Based upon the Marigold's mine plan developed prior to our acquisition,
production and cost guidance for the Marigold mine from April 4, 2014,
through December 31, 2014, was provided in our first quarter MD&A.
During the second quarter, integration of the Marigold mine, a review
of the 2014 mine plan and the application of our accounting policies to
the mine plan, specifically the application of IFRIC 20, Stripping Costs in the Production Phase of a Surface Mine, for deferred stripping, resulted in certain revisions to Marigold's cost
guidance to conform to our polices.
For the period from April 4, 2014 to December 31, 2014, Marigold
guidance (including second quarter actual results) is:
-
Cash costs per payable ounce of gold sold are now expected to total
between $800 and $900, a reduction from previous guidance.
-
Capitalized deferred stripping is now expected to total approximately
$20 million.
-
Capital expenditures and mineral reserve replacement drilling are now
expected to total $15 million, a reduction from previous guidance of
$20 million.
-
Production and sales remain between 105,000 and 115,000 ounces of gold.
Production at the Marigold mine in the second quarter of 22,060 ounces
exceeded the quarterly production guidance provided for the second
quarter of 20,000 ounces. Production in the third quarter is expected
to be approximately 33,000 ounces. As previously guided, the fourth
quarter is forecast to be the highest production period in 2014.
Quarterly production guidance is being provided to assist with
understanding of expected performance through the transition and
integration of the Marigold mine.
A number of activities are underway at the Marigold mine focused on
improving margins including the development of a revised mine plan and
mining efficiency projects to improve cost per tonne of material moved.
At the Pirquitas mine, our annual cash costs per payable ounce of silver
sold guidance is reduced to between $12.00 and $13.00 from between
$12.50 and $13.50 reflecting the strong cost performance at the mine.
Remaining guidance for Pirquitas and exploration and development
activities is unchanged from that provided in our 2013 year end MD&A
Outlook. Production guidance is between 8.2 and 8.6 million ounces of
silver.
On July 30, 2014, Argentina entered into a position of default on its
sovereign debt due to legal proceedings regarding holders of the debt
that had not accepted restructuring proposals in 2005 or 2010. We are
monitoring this situation and, at present, we are not experiencing any
impacts to our business operations in Argentina.
Financial Results
Mine Operations
-
Revenues were $64.3 million in the second quarter of 2014, compared to
$32.7 million in the quarter ended June 30, 2013. Cost of sales was
$53.3 million, including $6.7 million of non-cash depletion,
depreciation and amortization, in the quarter ended June 30, 2014.
This compares to cost of sales of $51.6 million and non-cash depletion,
depreciation and amortization of $11.3 million in the quarter ended
June 30, 2013.
-
Income from mine operations was $11.0 million in the second quarter of
2014, compared to a loss from mine operations of $19.0 million in the
quarter ended June 30, 2013.
Net Income
-
Net loss was $7.3 million, or $0.09 per share, in the second quarter of
2014, compared to net loss of $235.9 million or $2.92 per share in the
quarter ended June 30, 2013.
Liquidity
-
Cash and cash equivalents were $102.2 million at June 30, 2014, compared
to $415.7 million as of December 31, 2013. Working capital was $427.5
million at June 30, 2014, compared to $584.1 million at
December 31, 2013.
Selected Financial Data
(US$000's, except per share amounts)
This summary of selected financial data should be read in conjunction
with our management's discussion and analysis of the
financial position and results of operations for the three and six
months ended June 30, 2014 ("MD&A"), the unaudited
condensed consolidated interim financial statements for the three months
ended June 30, 2014 and June 30, 2013, and the
audited consolidated financial statements for the year ended December
31, 2013.
|
|
|
Three Months Ended
June 30, 2014
|
Three Months Ended
June 30, 2013
|
|
Revenue
|
64,287
|
32,654
|
|
Income (loss) from mine operations
|
11,022
|
(18,971)
|
|
Operating income (loss)
|
2,179
|
(229,471)
|
|
Net loss for the period
|
(7,262)
|
(235,945)
|
|
Basic loss per share
|
(0.09)
|
(2.92)
|
|
Cash generated by operating activities
|
(1,046)
|
4,118
|
|
Cash used by investing activities
|
(293,243)
|
(26,960)
|
|
Cash generated by financing activities
|
—
|
—
|
|
|
|
|
|
Financial Position
|
June 30, 2014
|
December 31, 2013
|
|
Cash and cash equivalents
|
102,162
|
415,657
|
|
Current assets - total
|
527,206
|
688,203
|
|
Current liabilities - total
|
99,662
|
104,124
|
|
Working capital
|
427,544
|
584,079
|
|
Total assets
|
1,252,568
|
1,191,241
|
Review of Projects
Pitarrilla, Mexico
As we previously announced, due to the changes to the Mexican mining tax
and royalty regime and prevailing market conditions, we deferred a
construction decision for the open pit mine at Pitarrilla and have
placed all project activities on hold. In addition, we have reduced
our presence on site, while continuing to fulfill our commitments to
local communities.
Capitalized expenditures at the Pitarrilla project during the second
quarter of 2014 amounted to $1.1 million compared to $3.6 million in
the same period of 2013.
Activities during the first six months of 2014 have been limited to
surface rights acquisition, review of alternative development options
and meeting commitments to local communities in the project area. A
number of development options for Pitarrilla were examined during the
quarter, including underground only and combined open pit-underground
scenarios.
The Pitarrilla project remains an important development asset in our
portfolio with significant Mineral Resources and Mineral Reserves of
silver, lead and zinc and we will continue to evaluate alternative
options going forward.
San Luis, Peru
Capitalized expenditures at our wholly-owned San Luis project located in
the Ancash Department, Peru, during the three months ended June 30,
2014, amounted to $2.0 million compared to $2.6 million in the
comparative period of 2013.
The San Luis project comprises a 35,000 hectare area which includes
several vein systems across an area of land whose surface rights are
held by two separate communities, Ecash and Cochabamba. A feasibility
study was completed on the Ayelén vein and the environmental impact
assessment was approved in 2012. The execution of the project requires
land access negotiations to be completed with both communities. To date
we have reached an agreement with the Cochabamba community and we are
continuing to pursue an agreement with the Ecash community. We have
also identified an additional potential high grade gold vein target,
the Bonita Zone, which is located entirely within the area held by
Cochabamba. The target was sampled and trenched during 2010.
In 2013, we signed a five-year extension agreement with the Cochabamba
community granting us access rights to conduct exploration activities
on the community lands that cover the southwestern sector of the San
Luis project. This extension enables us to complete exploration work on
the Bonita Zone. All required exploration permits for the Bonita Zone
target were obtained during the second quarter and in July 2014 a drill
rig was mobilized to the property in anticipation of project start in
early August.
We continue to pursue an agreement with the Ecash community in order to
reach alignment on a benefits and surface use agreement over the
remaining surface rights required for the Ayelén vein project. If we
are able to conclude a land access agreement, we will then be able to
submit permit applications and make a development decision.
Parral, Mexico
We hold four mineral properties in the mining district of Parral in the
southern Chihuahua State, Mexico and are evaluating such properties for
their potential to yield economic silver deposits. Our ongoing
exploration of these properties has involved detailed geological
mapping and sampling of outcroppings that host silver-bearing quartz
veins and veinlets.
Qualified Persons
The scientific and technical data contained in this news release
relating to the Pirquitas mine has been reviewed and approved by Trevor
J. Yeomans, B.Sc. (Hons), a Qualified Person under NI 43-101 and our
Director, Metallurgy. The scientific and technical data contained in
this news release relating to the Marigold mine has been reviewed and
approved by Thomas Rice, SME Registered Member, a Qualified Person
under NI 43-101 and our Technical Services Manager at the Marigold
mine.
Risks and Uncertainties
For information regarding the risks and uncertainties affecting our
business, please refer to the section entitled "Risk Factors" in our
most recent Form 40-F and Annual Information Form filed with the SEC
and Canadian securities regulatory authorities, which is available at www.sedar.com, the EDGAR section of the SEC website at www.sec.gov, and on our website at www.silverstandard.com.
Management Discussion & Analysis and Conference Call
This news release should be read in conjunction with our unaudited
condensed consolidated interim financial statements and the MD&A as
filed with the Canadian Securities Administrators and available at www.sedar.com or our website at www.silverstandard.com.
-
Conference call and webcast: Thursday, August 7, 2014, at 10:00 a.m.
EDT.
|
|
Toll-free in North America:
|
+1 (888) 429-4600
|
|
|
All other callers:
|
+1 (970) 315-0481
|
|
|
Webcast:
|
www.silverstandard.com
|
Audio replay will be available for one week by calling:
|
|
Toll-free in North America:
|
+1 (855) 859-2056, replay conference ID 67208722
|
|
|
All other callers:
|
+1 (404) 537-3406, replay conference ID 67208722
|
Cautionary Note Regarding Forward-Looking Statements
This news release contains forward-looking statements within the meaning
of the U.S. Private Securities Litigation Reform Act of 1995 and
forward-looking information within the meaning of Canadian securities
laws (collectively, "forward-looking statements"). All statements,
other than statements of historical fact, are forward-looking
statements.
Generally, forward-looking statements can be identified by the use of
words or phrases such as "expects," "anticipates," "plans," "projects,"
"estimates," "assumes," "intends," "strategy," "goals," "objectives,"
"potential," or variations thereof, or stating that certain actions,
events or results "may," "could," "would," "might" or "will" be taken,
occur or be achieved, or the negative of any of these terms or similar
expressions. The forward-looking statements in this news release relate
to, among other things: our ability to successfully integrate the
Marigold mine acquisition; future production of silver, gold and other
metals; future costs of inventory and cash costs per payable ounce of
silver, gold and other metals; the prices of silver, gold and other
metals; the effects of laws, regulations and government policies
affecting our operations or potential future operations; future
successful development of our projects; the sufficiency of our current
working capital, anticipated operating cash flow or our ability to
raise necessary funds; estimated production rates for silver, gold and
other metals produced by us; timing of production and the cash and
total costs of production at the Pirquitas mine and the Marigold mine;
the estimated cost of sustaining capital; ongoing or future development
plans and capital replacement, improvement or remediation programs; the
estimates of expected or anticipated economic returns from our mining
projects including future sales of metals, concentrates or other
products produced by us; and our plans and expectations for our
properties and operations.
These forward-looking statements are subject to a variety of known and
unknown risks, uncertainties and other factors that could cause actual
events or results to differ from those expressed or implied, including,
without limitation, the following: uncertainty of production,
development plans and cost estimates for the Pirquitas mine, the
Marigold mine, the Pitarrilla project and the San Luis project; future
development risks, including start-up delays and operational issues;
our ability to replace Mineral Reserves; our ability to complete and
successfully integrate announced acquisitions, including the Marigold
mine acquisition; our ability to obtain adequate financing for further
exploration and development programs; commodity price fluctuations;
political or economic instability and unexpected regulatory changes;
currency fluctuations, particularly the value of the Argentine peso
against the U.S. dollar; the possibility of future losses; general
economic conditions; the recoverability of our interest in Pretium
Resources Inc. ("Pretium") and our other marketable securities,
including the price of and market for Pretium's common shares and such
other marketable securities; potential export duty on current and past
production of silver concentrate from the Pirquitas mine;
recoverability and tightened controls over the VAT collection process
in Argentina; counterparty and market risks related to the sale of our
concentrates and metals; differences in U.S. and Canadian practices for
reporting Mineral Reserves and Mineral Resources; uncertainty in the
accuracy of Mineral Reserves and Mineral Resources estimates and in our
ability to extract mineralization profitably; uncertainty in acquiring
additional commercially mineable mineral rights; lack of suitable
infrastructure or damage to existing infrastructure; delays in
obtaining or failure to obtain governmental permits, or non-compliance
with permits we have obtained; governmental regulations, including
health, safety and environmental regulations, increased costs and
restrictions on operations due to compliance with such regulations;
reclamation requirements for our exploration properties; unpredictable
risks and hazards related to the development and operation of a mine or
mine property that are beyond our control; compliance with
anti-corruption laws and increased regulatory compliance costs;
complying with emerging climate change regulations and the impact of
climate change; uncertainties related to title to our mineral
properties and the ability to obtain surface rights; recoverability of
deferred consideration to be received in connection with recent
divestitures; our insurance coverage; civil disobedience in the
countries where our properties are located; operational safety and
security risks; actions required to be taken by us under human rights
law; our ability to access, when required, mining equipment and
services; competition in the mining industry for properties; our
ability to attract and retain qualified personnel and management and
potential labour unrest, including labour actions by our unionized
employees at the Pirquitas mine; shortage or poor quality of equipment
or supplies; conflicts of interest that could arise from some of our
directors' and officers' involvement with other natural resource
companies; claims and legal proceedings, including adverse rulings in
current or future litigation against us and/or our directors or
officers, and assessments; potential difficulty in enforcing judgments
or bringing actions against us or our directors or officers outside
Canada and the United States; certain terms of our convertible notes;
and those other various risks and uncertainties identified under the
heading "Risk Factors" in our most recent Form 40-F filed with the SEC
and Annual Information Form filed with Canadian securities regulatory
authorities.
This list is not exhaustive of the factors that may affect any of our
forward-looking statements. Our forward-looking statements are based on
what our management considers to be reasonable assumptions, beliefs,
expectations and opinions based on the information currently available
to it. Assumptions have been made regarding, among other things, our
ability to carry on our exploration and development activities, our
ability to meet our obligations under our property agreements, the
timing and results of drilling programs, the discovery of Mineral
Resources and Mineral Reserves on our mineral properties, the timely
receipt of required approvals and permits including obtaining the
necessary surface rights for the lands required for successful project
permitting, construction and operation of the Pitarrilla project, the
price of the minerals we produce, the costs of operating and
exploration expenditures, our ability to operate in a safe, efficient
and effective manner, our ability to obtain financing as and when
required and on reasonable terms and our ability to continue operating
the Pirquitas mine and the Marigold mine. You are cautioned that the
foregoing list is not exhaustive of all factors and assumptions which
may have been used. We cannot assure you that actual events,
performance or results will be consistent with these forward-looking
statements, and management's assumptions may prove to be incorrect. Our
forward-looking statements reflect current expectations regarding
future events and operating performance and speak only as of the date
hereof and we do not assume any obligation to update forward-looking
statements if circumstances or management's beliefs, expectations or
opinions should change other than as required by applicable law. For
the reasons set forth above, you should not place undue reliance on
forward-looking statements.
Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources
classification terms that comply with reporting standards in Canada and
the Mineral Reserves and the Mineral Resources estimates are made in
accordance with NI 43-101. NI 43-101 is a rule developed by the
Canadian Securities Administrators that establishes standards for all
public disclosure an issuer makes of scientific and technical
information concerning mineral projects. These standards differ
significantly from the requirements of the SEC set out in Industry
Guide 7. Consequently, Mineral Reserves and Mineral Resources
information included in this news release is not comparable to similar
information that would generally be disclosed by domestic U.S.
reporting companies subject to the reporting and disclosure
requirements of the SEC. Under SEC standards, mineralization may not be
classified as a "reserve" unless the determination has been made that
the mineralization could be economically produced or extracted at the
time the reserve determination is made.
Cautionary Note Regarding Non-GAAP Measures
This news release includes certain terms or performance measures
commonly used in the mining industry that are not defined under
International Financial Reporting Standards ("IFRS"), including cost of
inventory, cash costs and total costs per payable ounce of silver sold
and adjusted net income (loss) and adjusted basic earnings (loss) per
share. We believe that, in addition to conventional measures prepared
in accordance with IFRS, certain investors use this information to
evaluate our performance. The data presented is intended to provide
additional information and should not be considered in isolation or as
a substitute for measures of performance prepared in accordance with
IFRS. These non-GAAP measures should be read in conjunction with our
consolidated financial statements.
W. John DeCooman, Jr.
Vice President, Business Development and Strategy
Silver Standard Resources Inc.
Vancouver, BC
N.A. toll-free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: invest@silverstandard.com
SOURCE Silver Standard Resources Inc.